Carrier-access Access Navigator Manual do Utilizador Página 144

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 704
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 143
6-40 August 2003 Access Navigator - Release 1.8
Electrical Installation
Apply Power and Verify Operation
Apply Power and Verify Operation
1. Apply –48 VDC power to Access Navigator and verify the following front panel status indications
(see Figure 6-26).
Requirement: CONTROLLER A POWER indicator lights green.
Requirement: CONTROLLER A ACTIVE indicator lights green.
2. If second (redundant) controller is present, verify the following front panel status indications.
Requirement: CONTROLLER B POWER indicator lights green.
Requirement: CONTROLLER B ACTIVE indicator is off.
NOTE: If power indicators do not light, check power connections (see DC Power
Connections on page 6-35).
Figure 6-26. Location of Front Panel Power-On Status LEDs
Controller ’A’ Indicators Controller ’B’ Indicators
Active
Controller
Power
Vista de página 143
1 2 ... 139 140 141 142 143 144 145 146 147 148 149 ... 703 704

Comentários a estes Manuais

Sem comentários